Resources and equipment Tec cables

TEC CABLES BOURG possesses an infrastructure of about 1000m² on the ArcelorMittal Wire site at Bourg-en-Bresse, in the Ain country, in the foot hills of the Alps.

We are equipped with a considerable range of special tooling:

  • 1 truck equipped with a hydraulic power pack and its draw-off or hold-back capstan, F = 15 T.
  • 3 site pick-ups.
  • 1 hold-back caterpillar, F = 20 T.
  • 1 Power-driven take-up.
  • 7 hauling winches from 3 to 90 T, with all their associated hydraulic power packs.
  • Holding jaws from 10 to 180 T.
  • 2 site containers.

A specialized, highly-skilled team:

Based in the Rhone-Alpes region, the TEC CABLES BOURG team is comprised of highly experienced technicians who have come from ArcelorMittal. Holders of licenses for driving HGVs, overhead work cages and forklift trucks, we are capable of a high level of autonomy on our missions. Trained for overhead work, our team is extremely attentive to both safety and the quality of its interventions, irrespective of the prevailing weather conditions (snow, rain, wind and cold). Our team speaks English, enabling us to intervene worldwide.


Etienne Maublanc
Director

Alain Cortes
Technician

Stephen Dedet
Technician

Christian Vernoux
Technician

Francisco Teixeira
Technician

News


Warning: mysql_connect() [function.mysql-connect]: Unknown MySQL server host 'mysql51-61.perso' (1) in /home/teccable/www/craft/mysql_connect.php on line 2

Warning: mysql_select_db() [function.mysql-select-db]: Can't connect to local MySQL server through socket '/var/run/mysqld/mysqld.sock' (2) in /home/teccable/www/craft/mysql_connect.php on line 3

Warning: mysql_select_db() [function.mysql-select-db]: A link to the server could not be established in /home/teccable/www/craft/mysql_connect.php on line 3

Plaquette